ATTENTION FOLKS,
We are still trying to perform activations of the Microsoft Products across the computer labs, but we may not be able to get to them all before xmas.
If you are needing to use Office, you have a few options:
1) Use Office 2011 on Mac
2) Use Office 2007 on Windows (we have 2 versions of office installed on the computers, 2010 is the one that requires activation, 2007 does not)
3) Use Office Online via Outlook.com (log-in with your username@lesley.edu), then click "Documents"
We apologize for the inconveniences this has caused you.. but please understand we are working diligently to fix them for the future.
If you need to talk to someone, please feel free to yell at Richard Phung, the Labs & Classrooms Coordinator at UT by emailing him: rphung@lesley.edu
or post on our facebook.
Showing posts with label notices. Show all posts
Showing posts with label notices. Show all posts
Friday, October 21, 2011
Wednesday, September 14, 2011
TECH and YOU SCHEDULE CHANGES
The Tech & You events for September 14, 2011 and September 21, 2011 have been CANCELLED due to scheduling constraints.The next meeting will be:
Thursday, September 29, 12:30pm – 2:00pm
at WOLF 201 (DOBLE CAMPUS)
Visit the FACEBOOK event page.
Please visit our information page:
http://lesley.edu/ut/academic/info.html
Thursday, September 29, 12:30pm – 2:00pm
at WOLF 201 (DOBLE CAMPUS)
Visit the FACEBOOK event page.
Please visit our information page:
http://lesley.edu/ut/academic/info.html
Labels:
announcement,
Focus Group,
Information Session,
notice,
notices,
Tech and You,
technology
Monday, May 23, 2011
PRINTER SERVER UPGRADES--- PRINTING IS DISABLED
PRINT SERVICES OFFLINE
UNTIL FURTHER NOTICE
Howdy, folks---
In case you haven't been following our Twitter, all print services are currently disabled for our classrooms.
We are slowly bringing them back online.
Please stay tuned!
In the meantime, you can check your print balances by visiting our new user interface:
http://lesley.edu/ut/payforprint
*which is accessible by on-campus only!
Thanks for your patience!
-- LesleyLabs
Monday, January 3, 2011
WINTER MAINTENANCE BEGINS!
First Quarter Maintenance has begun!
This is a major overhaul of all systems… basically, pressing the "reset" button on everything.
This includes:
- Re-Imaging the computer labs --- this involves fresh, installed-from-scratch computer configurations for ALL of the computer labs, kiosks, and computer classrooms. You can see our maintenance schedule for these areas here:
http://lesleylabs.blogspot.com/p/maintenance-schedule.html
BEWARE.. while we are flipping these computers, they will be unusable (OFF LIMITS). Please refer to the signs *posted outside the doors to the computer labs* and the schedule.
The configuration of these machines will be posted in a later note.
To get up-to-date notices on the actual maintenance procedure(s), please checkout our twitter feed:
http://www.twitter.com/lesleylabs
- Cleaning and repairing keyboards & peripherals. --- we will be scrubbing-down and replacing keyboards and mice. Also, we're adding brand-new mouse-pads and security hardware.
- To put to bed malfunctioning A/V concerns, we are going through all of the digital labs and classrooms and are manually testing all peripheral components in these spaces. This involves rigorously using the DVD/VHS combination players, Auxillary Audio Inputs, Demo Stations (where available), and computer inputs in ALL areas. We are also replacing cables, restocking cables, and repairing connections (the little connector pieces). In addition, we are balancing the audio amplifiers, color-correcting + focusing the projectors… *for brightness and image sharpness.
Overall, this maintenance will take the better portion of the next 3 weeks (Starting January 3 until January 21)… We appreciate your patience during these times.
Labels:
maintenance,
notice,
notices,
notification,
rooms,
scheduling,
Spring 2011,
winter,
Winter Break
Wednesday, June 17, 2009
New Computer Lab Images

That's right, folks.. we are reformatting the computers in the computer labs at AIB. This is a fresh start for the Fall 2009. This is a painstaking process that begins with a completely fresh installation of MacOS (or other OS), and a piece-by-piece installation of the software for the academic curriculum(s) that use these facilities... In addition, we install supplemental programs (tools, codecs, apps, etc) to aid in general productivity.
Inevitably, there will be troubles with the selection of software...
IF you are a FACULTY, STAFF, or STUDENT that will be using the digital studios in the Fall 2009 and would like to request SPECIAL SOFTWARE, please do not hesitate to come by the office and talk about it. *** THE DEADLINE FOR SUBMITTING SOFTWARE REQUESTS WILL BE THE WEEK OF AUGUST 10, 2009... at this time, the labs will be prepped for school to start.
PLEASE do not wait if you have special classroom needs!
Our contact information:
Phone: 617.585.6663
Location: 700 Beacon St, 300M
Labels:
AIB-Legacy,
Art Institute of Boston,
contact,
images,
labs,
Legacy,
notices,
policy,
updates
Tuesday, June 9, 2009
Fixed Issues with HelpDesk
added contact information
added calendar
added classroom time schedule
fixing blog sections.
Labels:
AIB-Legacy,
Art Institute of Boston,
Legacy,
notices,
site updates
Monday, June 8, 2009
School's out for the summer!!

WELCOME!
Thanks for stopping by the computer labs during the summer!We are going through a lot of changes around here, so stay posted on the latest events around campus!
There are a few programs going on, so please check out our operating hours and availability!
Labels:
AIB,
AIB-Legacy,
Art Institute of Boston,
Legacy,
notices,
summer,
welcome
Subscribe to:
Posts (Atom)